OUR STEPS TO BEAUTIFY YOUR INTERIOR
1. Setup
 |
Rooms to be painted are scheduled with client. |

|
Large furniture is moved into center of room. |

|
Furniture is covered with new plastic to protect from dust and paint. |

|
Floors are covered with drop clothes. |

|
Remove electrical covers. |

|
Tape as required baseboards to prevent paint from dripping and splattering. |

|
If at all possible, we will complete each room so that you may enjoy that evening. |
|
| |
2. Preparation
 |
Glossy surfaces are scuff sanded with fine sandpaper or steel wool and cleaned. |

|
Holes and cracks in walls are patched and sanded. |

|
Caulk/putty holes and gaps in trim. |

|
Prime repaired items. |

|
Seal with 'Kiltz' ink, crayons, and water stains that may 'bleed' through the finish coat. |
|
3. Painting
 |
Apply number of coats of primer and finish coats specified in contract. |

|
Clean paint (cut) line between trim, wall and ceiling surfaces. |

|
Only top quality premium paints are used unless otherwise specified in contract. |

|
Paint is normally applied by brush and roller although low and high pressure spray is available under special circumstances. |
4. Cleanup
 |
Furniture is moved back to the original positions. |

|
Electrical covers replaced. |

|
Floors and carpets are cleaned. We pride ourselves in keeping your home clean. |

|
Cleaning is performed daily and upon completion of the job. |

|
All trash (paint cans, paint chips, old rags, caulking, etc.) is hauled away. |

|
Touch up paint is labeled and left with you the client.
Fixtures are replaced. |
5. Inspection
 |
The foreman inspects the work during the painting process. |

|
During the last phase, he does a final inspection. |

|
You are invited to check the job to ensure all contracted areas are painted properly. |

|
Final touch-ups are noted on a 'punch list' and are completed before the crew leaves. |
6. Finally
 |
You will be sent a Customer Comment Card and your Warranty card. |
7. Your Responsibility
 |
Remove pictures leaving nails in holes if you plan to re-hang back in same spot. |

|
Remove unwanted nails so the holes can be filled. |

|
Remove window treatments (this is good time to have them cleaned). |

|
Remove any breakables. Tables, shelves and floors should be empty. |

|
Open and shut painted windows every other day for a couple weeks to prevent sticking. |
|